Skip to content

Posts by Mark Adams

TLCD Architecture receives award for Outstanding Architectural Project of the Year

Santa Rosa Utilities Field Office, Front Entry

Last week TLCD Architecture, together with consulting engineers Winzler & Kelly, was presented the award for 2011 Outstanding Architectural Project of the Year by the American Society of Civil Engineers.  Upon receiving the Award, DanReiter of Winzler & Kelly credited the success of the project to the vision of the Owner, the City of Santa Rosa Utilities Department, and the collaborative commitment of the entire design/construction team to see that vision through to completion.

Sustainability goals were far exceeded in this 40,000 square-foot facility and its adjacent site. Functions of a training center, offices, and utilities shops are combined into an ultra-efficient building package.  The campus incorporates a number of sustainable design elements including photovoltaic arrays, innovative daylighting, heating and cooling systems and low impact site design with bioswales and native landscaping.

Left to Right: Mark Adams, Miles Ferris, Dan Reiter, Craig Gaevert

TLCD Architecture commences the Construction on St. Helena Montessori School

Exciting developments are happening at the St Helena Montessori School!  While classes resume in temporary facilities at the site, construction has begun on the first four of six buildings designed by TLCD Architecture.  These buildings also referred to as “the Quad” include the Administration Building, the Toddler Building, Preschool, and Elementary School.  The central focus of the Quad will be the courtyard formed by each of the buildings.  Because outdoor education is an integral part of the curriculum, each classroom building will have adjacent outdoor classroom spaces for structured play, agriculture, and animal care. Students will be engaged in regular observation of the construction activities and will even help design and build some of the landscape features. The General Contractor is Eames Construction from Petaluma.  The buildings are scheduled to be completed for occupancy in fall of 2012.

TLCD Architecture receives bids for Mendocino Transit Authority Maintenance Facilities

Bids were received on Friday, August 19 for the MTA Bus Maintenance project. There were a total of 5 bidders and we are pleased that four of the five came in below our estimated cost of construction for the base bid and four alternates.  The low bid, submitted by Arntz Builders, came in at just below $5,000,000 for the total project.   On August 25, the MTA Board agreed to award the base bid plus two of the Alternates, with the option of adding the other two Alternates at some time in the future.  Construction should commence in early September.

Second Annual TLCD Bowl-a-Rama!

Last Friday a group of TLCD folk and family tested their bowling skills during a friendly but spirited tournament.  Jay Jensen (Scott’s Dad) impressed us all as he walked away with the award for High Game (169) and High Individual Average.  Carl Servais captured the highly-coveted Most Strikes award. 

Dayna goes for one of her many spares

Other awards (and braggin’ rights) included:

Best Team Name: The Bowlinators

Most Likely to go Pro: Max Psadelakis (Nanette’s son)

Best Bowling Form: Alyssa Moore (Josh’s daughter)

Best Bowling Outfit: Scott Jensen (gotta love them shorts)

Most Creative Ball Toss: Kevin Teel (complete with face plant)

High Team Score: The Flintstones (Yabba Dabba Doooo!)

High Team Average: The Flintstones (Wilmaaaaaaaa)

It was a great change of pace from our work environment and big fun to hang out with family members we don’t get to see real often. Aside from a few sore thumbs and weekender aches, the group got through the workout to make it to the pizza round across the street at Mary’s Pizza Shack.

George Psadelakis (Nanette's hubby) shows the pro form

Serious team strategy sessions

Exciting developments on the St. Helena Montessori School

Construction Documents for the St. Helena Montessori School and Nimbus Art Center have been submitted for building permit and the Owners are anticipating the start of construction this summer.  The first phase will involve general site preparation with grading and utilities.  Portions of the school program are planned to be housed temporarily at the site (in modular buildings) to allow students to observe their school as it is being built.  Subsequent phases are being reviewed for scheduling and will most likely begin with the Primary/Elementary classrooms.  The graphics for the site plan and selected views will be posted online and at the site for a taste of what will be built over the next couple of years.  We’re excited, along with the School and Arts Community, to see things moving forward!  Check out the flythrough of the site – see below.

Follow

Get every new post delivered to your Inbox.